
EUROHOIST
The trolley and bridge will move simultaneously to the selected hopper opening

The electrical equipment used in EUROHOIST's semi-automatic waste grab cranes is designed in accordance with ISO, FEM, EN, VDE, IEC, DIN and other requirements. The components used in the equipment are mature and reliable products that have undergone decades of practical application. Sufficient load margin is reserved in the design to ensure safe and reliable operation during working conditions. The electrical components we provide are selected based on practical experience accumulated from the safe application of several hundred similar products over decades, and are highly suited to the environmental conditions and operating conditions of the waste pit.
In semi-automatic mode, the operator will maneuver the crane to collect material, and once loaded, it will select the hopper (hopper 1-2) to which the material is to be sent. When the crane bridge is activated, it will rise to a pre-programmed height, and the trolley and bridge will move simultaneously to the selected hopper opening. Once positioned, the operator will open the grab as needed.
In semi-automatic mode, the positioning, lowering, grabbing and closing of the grab are manually controlled.
EUROHOIST cranes are known for their durability and reliability, which is very important for any industry application, especially for special cranes such as waste handling cranes.
The efficiency of the entire waste treatment process depends to a large extent on these cranes, so they must have optimal operating performance.
We not only focus on the safety of lifting equipment and the lifted load, but are also committed to improving the safety performance of the user's entire production system.



